How Long Does this Whole Process Take?

Installation is the easy part.  Often the longest part of the process is permits and feedback from the gas utility compnay. Most homeowners wait until a storm or outage happens before calling. When that happens it can take longer than usual due to the high volume of installations. As it happens to you, it probably happens to neighbors who are calling us as well and the best way to beat the crowd is to start early.  A typical home standby generator will take about a day to install once all the proper paperwork has been filed and permits issued for the job. There are many components that come into play when installing a generator.

 

Our Process is Fairly Simple

 
[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]1[/dropcaps]

Free Home Consultation & Site Survey by Albright Electric

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

We answer any questions and evaluate your homes electrical system as well as the circuits you would like to backup to give you an adequately sized generator.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]2[/dropcaps]

Contract Signed by both Albright and the CustomerCodestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

After the initial consultation you will be provided with a professional contract that spells out every detail of the installation from start to finish.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]3[/dropcaps]

Contract Signed and Deposit Received

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

Once the customer agrees to the terms we go to work for you. We file a gas inquiry form with the gas utility company and begin the permit process.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]4[/dropcaps]

Permits Issued and Gas Utility Confirms Adequate Pressure

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

Once we have confirmation that there is adequate pressure for a generator installation and the town issues the permit. We schedule your installation date.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]5 [/dropcaps]

Pre-installation visit

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

We send our installation foreman to your home before installation day to make a materiel list and to go over the installation so that there are no surprises on the install date.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]6[/dropcaps]

Foundation & Generator Installation Day

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

Our men will come to your home and install the foundation you chose with your install, as well as the generator and transfer switch. You will be without power for approx. 2 hours.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]7[/dropcaps]

Gas Piping Installation Day

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

After the generator is set our plumber will come to your home to install the gas piping and pressure gauge needed to pass the plumbing inspection.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]8[/dropcaps]

Final Inspection by Town Officials

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

After installation is complete we will schedule your final inspections. Once all inspections have been passed we will schedule a walk-thru.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]9[/dropcaps]

Initial Startup and Walk-Thru with Albright Rep.

Codestar

[/two_col_50_50_col1]

[two_col_50_50_col2]

Our technician will perform a start-up as per manufacturers specifications. Once the start-up is complete we will run a live test of the system so you know what to expect when power goes out.

[/two_col_50_50_col2]

 

[two_col_50_50_col1]

[dropcaps style=’underline’ background_color=” underline_height=’4′ underline_color=’#3366ff’]10[/dropcaps]

Another Satisfied Customer

Codestar

[/two_col_50_50_col1]
[two_col_50_50_col2]

While the generator business is not repeat business, most of our installations lead to referrals. We offer $100 for any signed contract from a referral.

[/two_col_50_50_col2]

 